Page 66 - CPVC Fire Sprinkler Products Installation Instructions & Technical Handbook
P. 66
64 INSTALLATION
TFP-500 or TFP-600 Solvent Cement Cure Times
Nominal Pipe Size ANSI Inches DN
3/4 / DN20
1 / DN25
1 1/4 / DN32
Nominal Pipe Size ANSI Inches DN
3/4 / DN20
1 / DN25
1 1/4 / DN32
1 1/2 / DN40
2 / DN50
2 1/2 / DN65
3 / DN80
Nominal Pipe Size ANSI Inches DN
3/4 / DN20
1 / DN25
1 1/4 / DN32
1 1/2 / DN40
2 / DN50
2 1/2 / DN65
3 / DN80
Table U
Ambient Temperature Ranges During Cure Period
60°F to 120°F 40°F to 59°F 0°F to 39°F (16°C to 49°C) (4°C to 15°C) (-18°C to 3°C)
Minimum Cure Times for Systems Requiring Pressure Testing up to 100 psi (6,9 bar)
15 minutes
15 minutes
15 minutes
15 minutes
30 minutes
30 minutes
30 minutes
30 minutes
2 hours
Table V
Ambient Temperature Ranges During Cure Period
60°F to 120°F 40°F to 59°F 0°F to 39°F (16°C to 49°C) (4°C to 15°C) (-18°C to 3°C)
Minimum Cure Times for Systems Requiring Pressure Testing up to 200 psi (13,8 bar)
45 minutes
45 minutes
1-1/2 hours
1-1/2 hours
6 hours
8 hours
8 hours
1-1/2 hours
1-1/2 hours
16 hours
16 hours
36 hours
72 hours
72 hours
24 hours
24 hours
120 hours
120 hours
*
*
*
Table W
Ambient Temperature Ranges During Cure Period
60°F to 120°F 40°F to 59°F 0°F to 39°F (16°C to 49°C) (4°C to 15°C) (-18°C to 3°C)
Minimum Cure Times for Systems Requiring Pressure Testing up to 225 psi (15,5 bar)
1 hour
1-1/2 hours
3 hours
3 hours
8 hours
24 hours
24 hours
4 hours
4 hours
32 hours
32 hours
48 hours
96 hours
96 hours
72 hours
72 hours
10 days
10 days
*
*
*
* For this size pipe and fitting, the solvent cement can be applied at temperatures below 40°F (4,4°C), however, the sprinkler system temperature must be raised to a temperature of 40°F (4,4°C) or above and allowed to cure per the requirements listed above prior to pressure testing.