Page 101 - CPVC Fire Sprinkler Products Installation Instructions & Technical Handbook
P. 101
APPENDIX B - DO’S & DON’TS 99
• Install TYCO CPVC Pipe and Fittings according to this Installation
Handbook.
• Follow recommended safe work practices.
• Make certain that any materials coming in contact with TYCO CPVC Pipe and Fittings are chemically compatible with BLAZEMASTER CPVC. (See Notice located on Page 55, Chemical Compatibility section.)
• If painting is required, use only latex based paints.
• Keep pipe and fittings in original packaging until needed and away from sources of heat.
• If stored outdoors, cover the pipe and fittings with an opaque tarp.
• Follow proper handling procedures.
• Inspect TYCO CPVC Pipe and Fittings for damage before installation.
• Use tools specifically designed for use with CPVC pipe and fittings.
• Use only TFP-500 or TFP-600 One Step Solvent Cement and follow application instructions.
• Use a drop cloth to protect interior finishes.
• Cut the pipe ends square.
• Before solvent cementing, de-burr and bevel the pipe end.
• When solvent cementing, rotate the pipe 1/4 turn when bottoming pipe in fitting socket.
• Carefully follow instructions for applying solvent cement. Do not apply too much cement.
• Avoid puddling of solvent cement in pipe and fittings. Do not allow cement to plug the sprinkler adapter or sprinkler orifice.
• Follow the recommended cure times prior to pressure testing.
• Fill lines slowly and bleed the air from the system at the farthest sprinklers prior to pressure testing.
• Use water to pressure test the CPVC system. If low-pressure air or nitrogen pre-testing is deemed necessary, guidelines can be found on Page 65 of this installation manual and must be followed.
• Support sprinkler properly to prevent excessive movement of the sprinkler when activated.
• Install TYCO CPVC Pipe and Fittings in wet systems only or specially 7 listed dry systems.
• Use only chemically compatible insulation and/or glycerin & water solutions for freeze protection.
• When glycerine solutions are used, provide an expansion chamber or allow for thermal expansion of the solution.
DO’S